Replacing a barn floor, extending a livestock building or putting up a new one: concrete must make its way through doors and narrow alleys, right next to a herd that stays on site.

Pompage de Béton Express handles concrete pumping for farm buildings from Mirabel to the Upper Laurentians. This guide explains how the pump reaches inside and how to organize the day with the farm.

Four Things to Settle for a Barn Floor

Before the first mixer truck rolls into the yard, these decisions need to be made with the farm.

In Through the Door

The truck stays outside while its pipeline runs into the building, right down to the last stall in the alley.

Keep the Herd Away

Noise, vibration and people coming and going: a pen or a closed-off section keeps the animals clear of the work area.

A Floor Ready for Concrete

Manure scraped, forms, rebar and tubing in place: the site crew finishes everything before the pump arrives.

Work Around Farm Chores

Milking, feeding, the milk truck: schedule the pumping for when it disrupts the farm's routine the least.

Getting Concrete Inside a Livestock Building

In an existing barn, a mixer truck can hardly ever reach the area to be poured: low ceilings, narrow alleys, posts, waterers and gates are in the way. Even in an empty building, its weight would rut the freshly compacted gravel base.

A line pump solves the problem. It sets up outside where the ground holds well, and its pipeline, put together length by length, enters the building through a doorway or a wall opening. It follows the feed alley or the row of stalls, then gets shorter as the crew works its way back to the exit.

On a new building, the answer depends on how far construction has gone. As long as the roof isn't on, a boom of 28 to 42 metres can place the concrete from above, straight into the forms. When walls and roof are up, switching back to a line pump is usually simpler.

Before recommending equipment, our team looks at door widths, turns along the route and how far the yard is from the back of the building. To compare both approaches, read our guide boom pump or line pump.

In Short

For a barn floor, the most common solution is a line pump: it stays outside and its pipeline enters through a door, so no truck drives into the building. Pompage de Béton Express advises you on the rest: animals kept away, the floor ready before the pump shows up and a pumping time set around the farm's schedule.

Gutters, Slopes and Heated Floors: The Prep Work

A livestock building slab is rarely just a flat surface. It may include gutters or manure channels, slopes toward the drains, stall curbs and, in some buildings such as a nursery barn, heating tubes embedded in the concrete.

These details are decided long in advance with the engineer or agronomist on the project, then put in place by the crew that builds the forms and sets the rebar. On pumping day, check that:

  • gutter and curb forms are firmly secured;
  • heating tubes are tied down and have been pressure-tested by your contractor;
  • level marks are visible to the finishers;
  • a non-slip texture is planned, since hooves need grip.

As the concrete goes in, the hose hovers over the bars and tubing without crushing them, and our operator matches the pump's pace to the finishers' progress.

Concrete pump hose over a floor with radiant heating tubes, inside a building under construction

Planning Pumping Day with the Farm

While the pump is on site, the farm keeps running. This table sums up what falls to the operation, from the evening before until the animals return.

WhenWhat the Farm Should Plan
The evening beforeAnimals moved, alleys cleared, access door unblocked
On arrivalSomeone to guide the trucks to the agreed spot
During pumpingNobody in the alleys, gates closed, no tractor near the pipeline
CleanupA designated spot, away from waterers and ditches
AfterwardAnimals kept off the slab until your contractor gives the go-ahead

A few farm-specific details save time. If the building has mechanical ventilation, don't park the truck in front of an air intake: its exhaust would be drawn inside. Also keep a lane open for the milk truck or feed deliveries, which are hard to reschedule.

Book early so the finishers, the pump and the mixer trucks all line up. Describe your building in the quote form, or see our agricultural services for other farm projects.

Barn Floor: Frequently Asked Questions

Can the floor be poured while animals stay in the building?

Yes, if a closed-off section keeps them well away from the work. Truck noise and workers moving around can stress the herd: a temporary partition or an outdoor pen, agreed on with the farm, protects both the animals and the crew. During pumping, no animal or person should be near the pipeline.

Can the pipeline go through a regular service door?

In most cases: the pipeline is narrow and lies on the ground. You need an opening that stays clear the entire time and a route with no overly tight turns. Mention the door widths in your request; we'll tell you if another entrance would work better.

Does the old slab have to be removed before pouring the new one?

It depends on its condition and on what your contractor and engineer plan: some slabs are broken out, others receive a new layer. Our work starts once the surface is ready: we pump the concrete and place it where the site crew needs it.

Is a barn floor poured all at once?

Not necessarily. In a large building, the floor is often poured in sections separated by the joints the engineer has drawn, which keeps part of the barn in use. Your contractor decides how to divide it; each section is then scheduled with our dispatch as its own job.

Where should the pump truck park in the yard?

Wherever the ground is firm under the outriggers: compacted gravel rather than plowed soil or an old filled-in pit. Also leave room for the mixer trucks to take turns at the hopper without blocking the tractors. The final spot is confirmed on site when the pump arrives.

Express pump truck with its boom arched over footing forms, in a clearing surrounded by autumn forest
Personalized Quote

Quote Request: Barn or Livestock Building

Describe the building, its door widths and when you'd like the work done. Pompage de Béton Express can also take your call: dial dispatch at 450-821-1165.

Barns and livestock buildings
Pipeline through the door
Fits the farm's schedule

Request for Proposal

Protected by reCAPTCHA. Privacy and Terms

www.piscineetspaje.comwww.renovationjuliendube.comwww.pepiniererdn.cawww.etiquettetabiere.cawww.barricadage247.cawww.tweetyinstallation.cawww.lingeriemaillotschristine.cawww.monmecanohp.cawww.veterinairesteannedesplaines.cawww.lepimentthai.cawww.redshack.cawww.enseignescommerciales.cawww.tonconcours.cawww.hauteprotection.cawww.demenagementfpareexpress.cawww.pizzasthippolyte.cawww.centredegravureelite.cawww.revetementsericpaquette.cawww.fonduelexcellentbistro.ca2mconstruction.catekoexcavation.com/installations-septiqueswww.tapis-rouge.cawww.tonaffiche.cawww.dejuco.comwww.acheteursdemaison.cawww.vertetpropremenage.cawww.pavagescellantnational.cawww.sophiesthilaire.cawww.fenetresfel.comwww.maplateforme.cawww.plafonds.cawww.ggbearing.cawww.poussoirs-facing-automatique.cawww.bistrobarduparc.cawww.entdaunais.comwww.vacbsignature.comwww.signalisationdunord.comwww.lesconstructionsdupuy.cawww.alphabarbecue.cawww.conceptpos.comwww.sythcoconstruction.comwww.purecliniquemedicale.cawww.lestapischauffants.cawww.urgencedrain.cawww.cuveavin.comwww.restaurantlabelleprovince.cawww.lestapischauffants.cawww.cliniquededenturologiemichelallaire.cawww.stabilipieux.cawww.habitationeco.cawww.garagesmayer.cawww.toletscquebec.cawww.prcagencement.cawww.financementprivehypothecaire.comwww.mikesstjerome.cawww.asphalteem.cawww.mexigoexpress.cawww.salonrustikroyal.cad-riskfx.comwww.restaurantvilladeste.cawww.entretienmenagersquevillon.cawww.rhinosfootball.cawww.toiturerevetementdurand.cawww.cplefrancois.cawww.uniprodesro.comwww.vendrevitedirect.cawww.dominickgiguere.cawww.belleetmincestjerome.cawww.tournagemirabel.cawww.posedonglesrepentigny.cawww.teck-home.cawww.fontainemobile.comwww.menagemathile.cawww.restaurantmaserio.cawww.serigraphiejade.cawww.resto4coins.cawww.toituremikeetmike.cawww.hgsantebeaute.cawww.lavebottes.cawww.lesmoulurestsc.cawww.pourvoiriedulacgeorges.comwww.pompagedebetonexpress.cawww.promoimpression.cawww.solutionnewskin.cawww.garagepneusmecaniquenormanbelair.comperfophysio.comwww.saisongolf.cawww.dannyberger.cawww.lavage-olympique.cawww.synergienotariale.cawww.servicescliniques.cawww.toletsc.cawww.shelf-management-system.comwww.inspecgo.cawww.locatapis.comwww.entretienoptimum.cafissuresdefondation.ca/fissures-de-fondationwww.cfncanada.cawww.studioeand.cawww.tradingmentor.cawww.beacite.comwww.lamontagnedespoir.cawww.bingodeslaurentides.cawww.foliotelecom.comwww.le2586.cawww.lesentreprisesgpg.ca